Just 400 US Data Centers Now Consume More Power Than All of Michigan

Just 400 US Data Centers Use More Electricity Than Michigan

Just 400 US Data Centers Now Consume More Power Than All of Michigan

New Harvard research published in Nature Sustainability found that 403 hyperscale data centers operating between May 2024 and April 2025 drew as much electricity in a year as the entire state of Michigan. Most of that power came from fossil fuels, and data center emissions have tripled since before the AI boom. Facilities in Virginia, Oregon, Ohio, and Iowa accounted for over half the energy use—and the study excludes off-grid, behind-the-meter gas plants entirely.

Sometimes we know it, but sometimes it's behind an NDA, and no one ever sees it.
  1. andrewla

    I can't read the article itself (or maybe listen to it? Hard to see what this page actually is). I read Harvard's summary [1] of the article. The preprint is also available [2]

    One thing to note is that the framing "Just 400 US Data Centers" makes it seem like 400 out of the gazillion data centers use this much electricity, but the original research seems to be that they found exactly 403 "Hyperscale Data Centers" and evaluated them.

    The framing is technically correct (since there exist non-hyperscale data centers) but is clearly intended to be deceptive.

    [1] https://hsph.harvard.edu/news/hyperscale-data-centers-energy...

    [2] https://arxiv.org/pdf/2606.05420

  2. bradleybuda

    The GDP of Michigan is $734B. The combined cloud computing revenues of Google, AWS, and Microsoft (which make up a large fraction of this datacenter work, though not all of it) are $290B. So yes, we should expect the power usage of these things to be in the same order of magnitude.

  3. renehsz

    Datacenter power consumption wouldn't be an issue if that power came from local renewable sources.

    Unfortunately, the gas-fired turbines that are being built now feel like quite a regression. Or the additional load on the public grid, which in some places barely has any spare capacity left.

    It's not an unsolvable problem though. A sustainable hyperscale datacenter can be built. There just isn't enough of an incentive as long as buying gas and polluting the air is cheaper (because the cost of both is externalized on society)

  4. djeastm

    Somewhat related: Data centers used 22 percent of Ireland's metered electricity in 2024, up from 5 percent in 2015.

    https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/dat...

  5. mvkel

    The cherry-picking of the headline alone makes me not give the article any leash.

    "Just the McDonaldses in New York City use more electricity than North Dakota"

  6. Goodliff

    I work in AI, but this is obviously not sustainable unless renewable energy is used.

    But according to AI Multiple:

    Globally, only about 22% to 27% of the actual electricity consumed by AI and data center facilities comes directly from renewable energy sources like solar, wind, and hydropower.

    They recommend the obvious, "Prioritize inference efficiency over training efficiency" since most power is used for inference now.

    They reference research that shows that over 80% of AI compute is now used for inference.

    https://aimultiple.com/ai-energy-consumption

  7. maerF0x0

    The demand creates incentive for people to add capacity to the grid. IMO what's really needed is a combination of capital to invest into the grid plus incentives for the public to use less. (Eg: allow DCs to pay marginal bids / $ to those who voluntarily reduce their usage. Allow a DC to pay me, say, $10 to free up $10 worth of marginal electricity usage, they effectively pay double the market rate and I have a benefit from DCs)

  8. vjvjvjvjghv

    Why aren't they pushing hard on modular nuclear power plants people have been talking about since basically forever? Or maybe require to have a solar plant next to large data centers?